Members of the team popped in and out all day Saturday as we added the two main structural elements to the drive base. An adjustable roller ramp from which we will launch cubes and a pair of grabbers that will grab cubes and rotate 180 degrees to transfer cubes to the roller bed. We did as much as we could since we will miss a week of construction with Mr. Wall in Houston for a conference.